Fieldwork

Gas monitoring running at the completed HotBENT experiment

After the revision of one of the valves of the gas circulation system at the HotBENT experiment, on Sept. 16th 2021 the gas monitoring of all sampling ports within the drift was launched. This will allow observation of possible changes in the gas composition even during the early stages of the experiment.

The plug of the HotBENT experiment. Note the considerable amount of cables connected to the respective sensors within the HotBENT drift.
Categories
Fieldwork

Sampling at HotBENT

On Jun. 24th/25th 2021 Entracers performed the first gas sampling in the HotBENT experiment at the Grimsel Test Site.

Categories
Fieldwork

Gas sampling at the Mont Terri URL

Between April 8th and April 9th 2021 Entracers GmbH collected gas samples from the Full-scale Emplacement (FE) experiment located in the Mont Terri Underground Rock Laboratory.

Categories
Fieldwork

Gas monitoring of the HotBENT experiment at the Grimsel Test Site

Entracers GmbH had the opportunity to work on the gas monitoring of the HotBENT experiment at the Grimsel Test Site managed by Nagra. A few impressions can be found below.